A practical whole museum customization checklist should let an owner answer five questions before approving a proposal or releasing work: what is included, what each of the four delivery stages must produce, who owns every interface, what evidence is required at each decision gate, and which project inputs are still missing. Use it for children's museums, science venues and family exploration centers that need a connected project rather than a batch of standard equipment. Record each line as confirmed, open or not applicable, then add an owner, due date and evidence reference. DEEPBLUE can connect planning and design, R&D and manufacturing, engineering construction and sustainable operation, while qualified destination-market parties must still confirm regulated building, safety, accessibility, permit and professional responsibilities.
1. Define the service boundary before comparing proposals
Start the checklist with the decision the owner is actually making. Record the venue type, country and city, building status, approximate public area, priority audiences, experience purpose, intended opening window and requested delivery model. Then list every package that may be relevant: research, project definition, content planning, spatial design, exhibit design, engineering, prototypes, production drawings, manufacturing, factory assembly, packing, logistics support, site coordination, installation, commissioning, training, documentation and operation preparation. Give each package one status—required, optional, owner-provided or excluded. A price cannot be compared fairly while one proposal includes design development and another begins from owner-approved production files.
Write the output beside each included package. Planning may produce an approved brief, content framework, visitor journey and zone schedule. Design may produce coordinated plans, exhibit descriptions, material direction and interface information. Manufacturing may produce controlled drawings, samples, inspection records, assembly checks and packing identification. Site and operation work may produce installation information, issue records, functional checks, training and handover documents. Avoid labels such as complete or turnkey unless the listed deliverables explain what those words mean for this project.
Add assumptions and exclusions in the same table rather than hiding them in separate commercial notes. Typical questions include who provides the building survey, local engineering, base-building work, utility connections, taxes, customs information, lifting, storage, local labor, permits, independent testing, graphics translation and opening staff. The owner should require a supplier to identify any gap it has priced as an assumption. The scope gate is complete when every proposal can be traced to the same package list, deliverables, exclusions, owner inputs and change triggers.

2. Check the four delivery stages and their handovers
For planning and design, confirm that the team has defined the audience, educational or family-experience purpose, visitor journey, zoning, capacity assumptions, accessibility approach, exhibit mix, staff sightlines, support spaces and operating idea. Check that current building information has been received and that open surveys are visible. Each exhibit or experience should have a short requirement describing what the visitor does, what feedback appears, how the activity connects to the theme, what space and utilities it needs, and how staff will reset, clean or inspect it. The stage should end with an approval package and issue list, not only attractive images.
For R&D and manufacturing, check who converts approved intent into structures, mechanisms, controls, software, materials, finishes, service access and transport modules. List the drawings, calculations or specifications relevant to the item, the sample and prototype questions, the revision that controls production, inspection points, functional checks, pre-assembly, module labels and packing evidence. DEEPBLUE's connected manufacturing capability can coordinate multiple processes, but a general factory photograph does not prove that a specific exhibit met its requirements. The checklist must point to evidence for the actual package.
For engineering construction and sustainable operation, confirm the route from factory release to an operating venue. Check surveys, access, site readiness, utilities, fixing and structural interfaces, sequencing with other trades, protection, storage, installation records, post-installation checks, issue close-out and responsibility for local inspections. Then verify training, normal operation, opening and closing checks, cleaning, reset, consumables, spare or wear parts, troubleshooting, maintenance access and escalation. A handover is complete only when the future venue team can use the information and remaining actions have owners.

3. Assign owner, supplier and local professional responsibilities
Create a responsibility matrix with one accountable party for every critical decision. The owner normally controls the business brief, funding, site rights, procurement route, appointment of local professionals and final commercial approvals. The agreed DEEPBLUE scope can connect planning, exhibit development, manufacturing, construction coordination, installation support and operation preparation. Local architects, engineers, contractors, consultants and authorities remain necessary wherever the destination requires licensed design, code review, permits, inspections or local execution. Whole-museum service does not automatically transfer all local legal duties to an overseas supplier.
Include information responsibilities, not only physical work. Name who supplies reliable plans, survey data, structural and utility information, local code criteria, content approvals, language files, customs requirements, site programme and access restrictions. Specify the required format, due date and reviewer. Missing owner input can delay design or production, while late supplier information can block local coordination. An interface register should connect each zone or exhibit to its building needs, source drawing, responsible party, decision date and status.
Define authority for comments and changes. Name the project lead, design approver, technical reviewers and people authorized to change cost, programme or scope. Require controlled drawing revisions, a consolidated comment route and a change record that identifies affected documents, products, site work and dates. One interaction change may affect a mechanism, electrical load, footprint, graphics, packing and surrounding circulation. The responsibility gate is complete when no critical task has two assumed owners or no owner at all.

4. Require evidence at every decision gate
At project-definition and concept gates, ask for the approved brief, scope schedule, responsibility matrix, assumptions, exclusions, preliminary programme, site-information register, content structure, visitor journey, plans, exhibit schedule and open-issue log. Each document should show its revision and approval status. The checklist should distinguish information for discussion from information released for the next stage. A rendering can communicate visual intent, but it cannot replace coordinated dimensions, interfaces, materials and acceptance criteria.
At design and manufacturing gates, identify the evidence needed for the risk being approved. This may include coordinated drawings, material or finish samples, prototype observations, software or control reviews, inspection records, functional checks, pre-assembly photographs, correction logs and packing lists. Define the question and acceptance method before requesting a prototype or test. Factory checks verify the agreed product package; they do not replace destination-market approvals, independent tests or certifications assigned to qualified parties.
At site and handover gates, require readiness confirmation, delivery and storage records, installation and connection checks, issue tracking, functional verification under site conditions, close-out evidence, final documents, operation guidance, training records and unresolved-action ownership. Photographs support context, but controlled records provide the decision trail. Avoid accepting unsupported claims such as best, guaranteed or maintenance-free. The evidence gate is complete when the owner can trace the approved brief through design, manufacturing, installation and operator handover without relying on undocumented promises.

5. Prepare the project information package and next action list
For an initial whole-museum assessment, assemble the country, city, venue type, owner organization, building status, approximate area, current plans and photographs, access route, known utilities, audience, themes, desired experience, operating approach, target opening window and requested service scope. Add the procurement stage, available budget boundary or status, decision makers, local professional team, review languages and known approval route. Mark unverified dimensions, missing surveys and undecided requirements clearly. An explicit unknown can become a planned task; a guessed answer can become an unreliable price or programme.
Use the completed checklist to compare responses line by line. Confirm whether each party has accepted the same scope, provided the same level of deliverable, stated the same owner work and exposed the same dependencies. Record questions that must be answered before concept approval, manufacturing release, shipment, installation or opening. Do not force every line to confirmed too early. The purpose is to make uncertainty manageable and to stop the project from passing a gate when a high-consequence interface still has no evidence or owner.
Send DEEPBLUE the information package and the checklist items that need an answer. A useful first response should restate the understood brief, identify gaps, propose the next appropriate stage and explain what evidence that stage will produce. Final scope, price, dates, local responsibilities and approval methods remain project-specific and require written agreement. This keeps the first conversation practical: it connects the owner's current decision to planning and design, R&D and manufacturing, engineering construction and sustainable operation without pretending that incomplete inputs are already a final turnkey contract.
Whole museum customization decision checklist
- Venue purpose, audience, country, building status and opening objective are recorded.
- Every package is marked required, optional, owner-provided or excluded.
- Each included package has a named deliverable and approval gate.
- Planning, design, manufacturing, construction and operation handovers connect.
- Owner, DEEPBLUE, local professional, contractor and authority responsibilities are assigned.
- Building data, utilities, access, surveys and site-readiness inputs have owners and dates.
- Design revisions, comments, samples, prototypes and changes use controlled records.
- Manufacturing drawings, inspections, functional checks and packing evidence are defined.
- Local code, permits, accessibility, fire, electrical and structural reviews are assigned.
- Installation, commissioning, issue close-out and site checks are documented.
- Training, operation, cleaning, reset, maintenance, spares and escalation are included.
- Budget, programme, assumptions, exclusions and change triggers are visible.
Frequently asked questions
How should this checklist be used?
Give every line a status, accountable owner, due date and evidence reference. Review open high-consequence items before each approval or release gate.
Is a whole-museum checklist the same as a supplier-selection checklist?
No. Supplier selection evaluates the organization. This tool defines the project packages, responsibilities, evidence and inputs that any selected project team must control.
Does whole-museum service include every local approval?
No. The contract and responsibility matrix must assign local licensed design, code, permit, inspection and execution duties to qualified destination-market parties.
What evidence should be available before manufacturing?
Use approved and coordinated production information, resolved interfaces, controlled materials or samples, prototype findings where required, acceptance methods and a change route.
What should an owner send DEEPBLUE first?
Send the location, venue type, approximate area, building information, audience, purpose, opening objective, desired scope, available budget context and the checklist questions needing assessment.